Our engineering staff offers:
- Pipe Stress Analysis
- Vibration consisting of TVA’s, Seismic, Flow Induced Vibrations, Flow Induced Turbulence (FIT), Piping Vibration & Support Design (FIV)
- Thermo & Air Flow analysis for enclosed packages
- Structural and FEA Analysis
- Water Hammer Analysis
Design and Drafting
- General Arrangement
- P&ID’s
- Fabrication Drawings
- Welding and Piping Details
- Wiring Diagrams, Schematics
- FE Analysis
15 years of experience with specialized areas for your packaging requirements
- Driver Options:
- Engines
- Electric motors
- VFD’s
Engine Starting System
- Air or Gas Starting Systems
- Electric Coil Contactors for Electric Starter
- Explosion Proof Starters with battery bank
- Hydraulic Starting Systems and Accumulators
Engine Controls
- CAT ADEM Controller, J1939 Interface
- Waukesha, Detroit ECM’s
- Waukesha Ignition Systems
- Electric, Pneumatic, Hydraulic Governors
- Speed Controls, Woodward
Engine Cooling Systems
- On Skid Belt Driven Fan Radiator, Sheaves, Pulleys
- Horizontal & Vertical Separate Coolers
- Fire Pump Engine Cooling Heat Exchangers
- Sea Water Injection for Engine Cooling
- 90/10 Cu. Ni Sea Water Piping
Engine PTO
- Air Clutches
- Flywheel Clutches
- Engine PTO’s to implement auxiliary pump applications
Couplings
- Hydraulic Fit Type
- Disc Type
- Flywheel Mounted
- Elastomer Type
- Interference Fit Type
- U-Drive Couplings for Right Angle Gearbox
- Coupling Guard Design
Gearbox
- Speed Increase/Decreaser
- Double Reduction
- Right Angle
- Uni-Drive Two Position Gearbox
- AGMA and API Sizing
Lubrication Systems
- API Compliance for Gearbox and Pump Lubrication Systems
- Lube Power
- IPU
Pump Options
- Centrifugal
- Vertical In-line Submergible for fire pumps.
- Triplex and Quintaplex Reciprocating Pump
- Barrel Pump
- Rotary Screw Pump
- Multi-Phase Pump
API Plan Seals Systems
- Tandem Mechanical Seals.
- Single Seals
- All plan flushing systems
Control Panel Integration Options
- Allen Bradley
- Siemens
- Murphy
- Metron
- Firetrol
Enclosures
- Sound proof
- Fire suppression Systems
- Fire Rated
Fuel Make Up Tank Design
- UL Rated Fuel Tanks
- Air Receiver and Air compressor Design and Packaging
- Sizing Air Receivers
- Sizing Air Compressor, Electric and Diesel Driven.
Muffler
- Sizing Mufflers, Spark Arrestors, Silencers
- Water Cooled Exhaust Systems for T3 requirements